Restaurant design, implementation, management and coverage of the Happiness Island Festival at the King Abdulaziz Equestrian Stadium.
Engineering Works:
Design, implementation and supply of all landscape works with an area exceeding 5,000 square meters.
Design, implementation and supply of platforms, metal stages and theatrical lighting.
Design, implementation and supply of wooden platforms for some musical events and exhibition pavilions.
Design, implementation and supply of all electrical works on site (feeding points – lighting points – generators – distribution panels).
Design, implement and supply a water network to supply the place and cover the associated systems (for public use – temporary toilets – desert air conditioning).
Design, implementation and supply of HVAC works for the general atmosphere (desert air conditioners – spray pumps).
Design, implementation, supply and management of restaurant pavilions and children’s play areas.
General supervision and management of the festival.
Project Summary:
Project Name: Happiness Island Festival
Client: Riyadh Regulatory Authority in cooperation with the Entertainment Authority
Location:Kingdom of Saudi Arabia, Riyadh (King Abdulaziz Equestrian Stadium)