Happiness Island Festival

Project Description: 

Restaurant design, implementation, management and coverage of the Happiness Island Festival at the King Abdulaziz Equestrian Stadium.

Engineering Works:

  • Design, implementation and supply of all landscape works with an area exceeding 5,000 square meters.
  • Design, implementation and supply of platforms, metal stages and theatrical lighting.
  • Design, implementation and supply of wooden platforms for some musical events and exhibition pavilions.
  • Design, implementation and supply of all electrical works on site (feeding points – lighting points – generators – distribution panels).
  • Design, implement and supply a water network to supply the place and cover the associated systems (for public use – temporary toilets – desert air conditioning).
  • Design, implementation and supply of HVAC works for the general atmosphere (desert air conditioners – spray pumps).
  • Design, implementation, supply and management of restaurant pavilions and children’s play areas.
  • General supervision and management of the festival.
  • Project Summary:

    • Project Name: Happiness Island Festival
    • Client: Riyadh Regulatory Authority in cooperation with the Entertainment Authority
    • Location:Kingdom of Saudi Arabia, Riyadh (King Abdulaziz Equestrian Stadium)
    • Execution Period: 15 days
    • Project Date:2018